We come back to a deck that has
some of the decking down. The deck needs to be finished so we started hammering
and making measurement for the next pieces of decking to come from the saw. We
make many notches to get around post that hold the railings. After we got the
main section of the deck done we moved to the small front entrance deck with
three steps. This deck still needed to be pulled apart so we once again ripped
off all the decking and loaded it up and brought it to the dump. When we got
back from the dump we then went back pulled up all the nails and started
decking again. The hardest part was to deal with the steps leading up to the
deck we had to make angle cuts to go around the corner so that it would look
good. After we finished nailing down the stairs it was time to start the
decking on the main entrance deck. We chose a spot to start the decking and
work are way down as efficient as possible so that we could finish up by the
end of the day but after we nailed off the finial decking there was still one
last thing which was the two benches that were attached to the deck, they need
to be rebuilt. So we took the benches back to are shop took off all the old
rotten parts of it which was everything but the frame. We then finished
rebuilding them and brought them back to the deck.
Showing posts with label Hunter C. Show all posts
Showing posts with label Hunter C. Show all posts
Saturday, May 18, 2013
week 5 blog 14
Starting the day off with a warm
cup off coffee to wake up. We show up at the jobsite ready to work we take down
the caution tape so it’s not in the way and we start pulling the old nails
because the old nails that held down the old decking still stay in the deck
frame and don’t usually come out with the deck boards. So we spend a lot of
time pulling out old nails because they don’t come out easily. After we spent a
long part of the day pulling out nails we then moved to brackets that help hold
the frame together the reason we are doing this is because who ever built the
deck in the past didn’t put them on so we put on the brackets on which game the
structure a whole lot of support. After we put these brackets on we started the
decking but when putting on the decking you the beginning is always hard
because you need to figure out where to start and the measurement of the boards
going on. When you are putting down the deck it is hand nailed so I just was
pounding over and over again on nails to put on the decking, but when hammering
these nails you must make sure you hit the nail instead of the decking because
if you hit the decking with a hammer you will damage the deck. After the second
set of decking was set, it was much faster setting the rest.
week 5 blog 13
We started off a new job replacing
the decking on an old deck when building a deck you need to build the frame and
railing for it, but we were just re placing the old decking that had rotted
out. The deck was fairly large. So first you just choose any spot that you want
to start pulling up the decking up. When pulling the deck up, using a long bar
is really helpful to get good leverage. When pulling up the decking you must
make sure you pick up all the broken pieces so the homeowner is happy. When
pulling up this deck you want to keep everything neat so you can easily load it
into the truck. We take all the old decking and bring it to hiltz which is a
dump for construction worker too bring their waste materials from the jobsite.
When you show up to the dump you weigh in your truck and then go and dump off
the old decking and then go and weigh in again to see how much the load was and
since we have an account we just get billed. We then head back to the job site
to clean up anything that may still be there and bring it to the company shop
where it will stay until the next full load. Then we go back to the job again
and pack up the tools and put up caution tape around the deck frame so that
people will know not to be on it while it’s not safe.
week 4 blog 11
We showed up to the jobsite with
the two walls taken down and now it was time to take down the third and final
wall. We quickly take down the last wall and cleaned up so we could get to work
on the building process. After we cleaned up we started to build up the walls
again. The reason we are building the walls again is because the homeowner
wants the walls waist height. The first step in the walls is how high to build
them, we come to a measurement on how high we want the walls to be so its time
to build the walls. You build the walls right on floor with two by fours. After
we built the first wall you stand it up in place and since these walls aren’t
going to the ceiling its much easier to put them in place. After we stood up
the wall up we secured it into place. Then we start to build the second wall
which is different in two ways from what it was before its not as tall so it
wont hit the ceiling and its also not as wide so it can have a opening to the
room. The wall is built with the same materials as the first it just has
different dimensions after we built up the wall we then put it in place and
secured it down and connected it to the first wall, which makes them stronger
together. We then cleaned up and left for the day.
week 4 blog 10
We started off a job where we would
be opening up a room. The way we start is by taking down certain walls that the
homeowner wants down. Now this process is called demolition and usually you
only need a few tools, which consist of a regular hammer, sledgehammer, flat
bar, knife, and any other tool that just might come in hand while taking down
walls. Another very important part it of demolition is having the proper safety
gear on facemask to stop dust from going into lungs is the most important and
then there are safety glasses and just proper clothing. After we have most of
the tools that we would be using and safety gear we get to work and start the
demolition. When starting the demolition you want to choose a starting point
and work your way down. Depending on the situation you need to be careful about
what is around you so you don’t damage something that is suppose to be
demolished, but if you aren’t having to watch out for damaging anything you can
go all out and get the job done faster. Since we had other rooms to watch out
for though so we had to be careful not to damage anything in the room over.
After we got the fist wall down we clean up are mess and move to the next wall
to start tearing down, this wall comes down faster because its doesn’t have the
support of the other wall. After we tore down the second wall we cleaned up for the day.
Friday, May 10, 2013
rough draft
Hunter Coons
Ms. Tanner
Building Codes and
their Purpose
In construction
there are many confusions whether you need a building permit or not, due to the
fact that there are so many different codes and regulations that only apply to
certain areas of construction. When it
comes to making changes to your house, you have the right to make them as long
as they follow code. Many people want to
make changes with no hassle but don’t realize they need approval first. These rules are not supposed to be in the way
– they are for public safety. There are
multiple people working to find the best options to create better ways of
working in construction by:
“[s]tudying failures and disasters in the
past, governing bodies can determine and develop safer and more efficient ways
of doing things. Property by-laws are set by the municipal governments and
include things like property setbacks, which is related to neighbourhood and
city planning. It is what keeps your neighbour from encroaching their property
onto yours” (cite).
Their main source to gather information from is past experience with
disasters, using trial and error everyday. Building codes are essential for
providing public safety, but they are not absolute.
When working on a
home there is a building code sections that mainly focuses on the rules in a
common house. Over time there have been many changes to these codes so every so
often new editions are created when a significant amount of codes have changed.
The Seventh Edition Massachusetts Building Code (780 CMR) includes a basic
building code along with a specific one-and-two-family dwelling code. This
specific type of code is referring to single-family detached dwellings,
single-family attached dwellings, multifamily dwellings, two-family dwellings,
and dwellings above the ground floor of nonresidential uses. A dwelling is a
building or a part of a building that is use for residential occupancy (cite).
Both
sets of codes are based on international codes. Massachusetts then reviews the
international standards, making “extensive technical changes” (CMR i) based on
the recommendations and opinions of the Massachusetts Department of Public
Safety, Board of Building Regulations and Standards, and technical advisory
committees – all of which is required by Massachusetts General Laws and
specialized Codes and Regulations.
Within
all these departments, there are several committees designated to certain areas
of expertise, listed as the following: State Board of Building Regulations and
Standards, Building Official Certification Committee, Energy Advisory
Committee, Fire Prevention-Fire Protection Advisory Committee, Geotechnical
Advisory Committee, Loads Advisory Committee, One and Two Family Advisory
Committee, and Seismic Advisory Committee.
However,
even with all the effort produced from these experts, over time, these rules
and regulations need to be adjusted according to new information and
technology. Between editions, there is an amendment process, which allows
people to propose new changes in the form of a public hearing with the audience
of the Board of Building Regulations and Standards. Those for or against such
changes offer testimonies, and then any changes that are approved by the BBRS
are published through a “bi-weekly MASSACHUSETTS REGISTER, issued by the
Secretary of the Commonwealth,” (CMR iv).
To stay up to date, contractors and others of the sort must check for
amendments, since there is no way to notify everyone.
The Massachusetts
building code “is kept up to date through the review of proposed changes
submitted by code enforcement officials, industry representatives, design
professionals and other interested parties.”(CMR viii) This is to take away
high risk of injury during modification to One- and Two-family Dwellings. When
it comes to the transitions of the different editions “the State Board of
Building Regulations and Standards will implement a policy regarding continued
use of the current Sixth Edition,”(CMR iii). This policy allows any
construction that is going by the pass edition to finish up what they are
working on, and doesn’t make the contractor change their plans dramatically.
When it comes to
constructing, altering, repair, and demolishing one- and two-family dwellings
you are required to have a building permit.
There are multiple different kinds of permits and due to the fact that
construction work is never the exact same. These permit are modified to fit a
specific job and protect the safety of the contractor working the job and also
the homeowner who hired the contractors. There are also other situations where
you don’t need to get a building permit because they don’t interfere with the
public safety. Examples of changes that do not require a building permit a one
story building detached use for storage; playhouse and other similar uses don’t
not require a permit. Fences Six feet tall or less than six feet, retaining
walls that don’t affect public safety and retains back less than four feet, any
ordinary repairs that don’t “include the cutting away of any wall, partition or
portion thereof, the removal or cutting of any structural beam, column or other
loadbearing support, or the removal or change of any required means of egress
requirements;”(CMR 507). Having these changes limited is an easy way to prevent
injury or death from occurring at a lower rate. “When it comes to getting a
required building permit you need to go to Town Hall with all the information
including address of building, owner, your construction information, and your
plans of the structure you will be building or modifying.” (LGC).
When it comes to
building or working on these one and two-family dwellings one major code to
deal with is “780 CMR 5304 Minimum Room Areas”(CMR 551). This code makes it
mandatory for every, one and two-family dwellings to have at least one room
with one hundred and fifty square feet of floor, every other livable room
shouldn’t have less than seventy square feet. The minimum horizontal dimensions
for any live able space cannot be less than seven feet. When it comes livable
rooms, hallways, bathrooms, laundry rooms, and basements the height of the
ceiling must be no less than seven feet. When you make out the measurement for
the ceiling height you measure from the finished floor of the room to the
lowest point in the ceiling. There are few exceptions to this ceiling
regulation, which are “Beams and grinders spaced not less than four feet
(1219mm) on center may project not more than six inches (152mm) below the
required ceiling height.” (CMR 551) When it comes to basements that isn’t uses
for livable space can project within six feet, eight inches of the finished
floor. The other only time the ceiling can be under seven feet is when is has a
slope, but the slope has to reach seven feet before it goes pat the fifty
percent of the ceiling mark. Bathrooms must have a minimum height of six eight
inches.
When building a
bathroom one major section of it is the shower. When building a shower you must
have all surfaces nonabsorbent for the finish of the shower, the surface is
tile that can very in shape size color. The tiles also must reach a height of
six feet off the floor level.
Garages that have
a door directly into the house is allowed but it is prohibited for the door
lead into a bedroom. When having these opening to the house you wouldn’t want
much air to go back and forth between the garage and the house because of the
car fumes and any other kind of toxic air “the garage and residence shall be
equipped with solid wood doors not less than 1 3/8 inches (35mm) in thickness,
solid honeycomb core steel doors not less than 1 3/8 inches (35mm) thick, or
20-minute fire-rated doors.” (CMR 554) the dwelling must have a raised sill
from the garage to the dwelling up at least four inches. The ducts in the
garage going to the dwelling must be constructed of No. 26 gage of steel
sheeting at a minimum. When the garage is built attached to the dwelling it
must be separated 5/8 inch by a material called x Gypsum board. The room above
the garage also needs the same kind of material at the same thickness if it’s a
habitable room. When having a floor put
down in a garage, if you don’t just leave the cement in must be noncombustible
because of having automobiles and other equipment that could possibly go up in
flames.
The next large
safety factor is “stairways, ramps, exterior exit, balconies, hallways and
doors” (CMR 556). Any of these man made structures must me attached to the
primary structure for stability. With out attaching any of them allows the
possibility of injury or death while using these structures. The space under the stairs must have the
walls covered. (cite) Dwelling should have two different exit doors, these
doors must be set as remote as possible so that there are two very different
options in an emergency. Exit doors must be at the normal entry and exit level.
The reason for having it at the entry level is to make it like a normal
entrance and exit. Any exit door must be at a minimum of thirty-six inches wide
and the height of the table must be at a minimum height of six feet eight
inches. The door also must be hinged at the side; these exits are not allowed
to go through the garage “side-hinged swinging doors provided to meet these
requirements are permitted to swing inward. Only secondary doors are allowed to
travel through the garage and swing inward. Any other doors leading to other livable
rooms do not need the follow the requirements of the exit doors, but they have
their own set of requirements. The door must be at least a width of thirty
inches and the height must be at least six feet six inches unless it’s a door
to the bathroom witch can be at a minimum of twenty-eight inches wide.
Having any set of
stairs, “Handrails shall be provided on at least one side of each continuous
run of treads or fight with three or more risers” (CMR 558). Any flight of stairs
must have handrails that continuously go to the end of the flight of stairs.
The handrails must turn down into the ground or turn fully back and go to the
nearest post. If the handrails sit next
to the wall it must sit 1½ inch away from the wall at a minimum. When it comes
to handrail size there are a few different main types, which are know as type
one, and type two. Type one should have 1¼ inch diameter or up to 2¾ inch in
diameter. When the rail isn’t circular it must be at least have a perimeter
dimension of four inches, and can’t exceed 6¼ inch. The type two handrails are granted the size 6¼
inches, but it “shall provide a graspable finger recess area on both sides of
the profile” (CMR 558). The grip on the handrail must begin within a distance
of ¾ inch. When you measure the recess
you measure vertically from the tallest part of the profile.